LINXS 2019 Construction Photo Gallery
Click or tap a thumbnail below to view the image in a larger size. For mobile device users, we recommend viewing in landscape mode for the best experience.
Click here to view the most recent construction photos.
December 2019
-
Worker assembles crane that will be used in the construction of the cast-in-drilled-hole piles
-
Rebar cage used to construct the station columns is erected at the future CTA East station
-
Crews build barrier walls at Parking Structure 4 (formerly a connector bridge between parking structures)
-
The Upper West Way barrier wall is constructed
-
Crews perform demolition work and remove exterior panels from the former hangar
-
The future Maintenance and Storage Facility site is prepared for the first foundation pour
-
Crews commence placing concrete for the first Maintenance and Storage Facility foundation footing
-
LINXS craft ties rebar
-
LINXS proceeds with concrete placement at the Maintenance and Storage Facility
November 2019
-
Crews continue concrete placement inside the Central Terminal Area (CTA)
-
Steel reinforcement cage is set in the cast-in-drilled-hole pile at the future CTA East station
-
Crews utilize a tremie pipe to place concrete inside the cast-in-drilled-hole pile
-
Concrete placed at Automated People Mover's first cast-in-drilled-hole pile at future CTA East station
-
Survey crews providing layout for CIDH installation
-
Traffic management is critical to the safety of the traveling public during construction activities
-
While placing concrete, worker takes measurement to confirm depth
-
Subcontractor excavating CIDH with concrete tremie rack in the foreground
-
Work continues with cast-in-drilled-hole pile installation at future Intermodal Transportation Facility-West
October 2019
-
Automated People Mover falsework over the Metro tracks
-
First cast-in-drilled-hole pile excavation
-
Cast-in-drilled-hole pile casing for the Automated People Mover project
-
Steel reinforcement cage set in cast-in-drilled-hole pile
-
Concrete placed at first cast-in-drilled-hole pile
-
First cast-in-drilled-hole pile concrete placement
-
Cast-in-drilled-hole pile materials organized for for the first pile
-
Cast-in-drilled-hole pile excavation at the future CTA East station
-
Measuring the depth of the first cast-in-drilled-hole pile in the CTA
Renderings
-
People Mover train above the terminal loop
-
Central Terminal Area
-
People Mover as it rides by iconic Theme Building
-
Automated People Mover Guideway
-
Intermodal Transportation Facility East
-
People Mover train pulling into a station
-
Intermodal Transportation Facility West
-
Escalators leading to the Automated People Mover station
-
Center CTA Station Interior